Type of event: construction

Yorkton Region:
Hwy 16 - 3 km north west of Springside to 38 km south east of Sheho

  • Under Construction

  • Bridge out, Bridge under repair, Reduced speed required, One lane traffic, Watch for equipment and persons working, adjacent to road, Flagpersons in attendance, Be prepared to stop
  • expect delays of 20 to 30 minutes.
  • Vehicle width limit in effect: 4.3m
  • Reduced speed limit in effect: 30km/h

  • 2017-10-10 to 2018-01-31
  • Additional Info/ Detours

  • Legal Weight Loads Only. The bridge is being replaced. The temporary detour has traffic signal lights to indicate when it is safe to proceed.