Type of event: construction

Kindersley Region:
Hwy 4 - 1 km north of Saskatchewan Landing to 21 km south of Kyle

  • Under Construction

  • Reduced speed required, One lane traffic, Watch for equipment and persons working, Be prepared to stop
  • Vehicle width limit in effect: 3.3m

  • 2018-07-23 to 2019-08-01
  • Additional Info/ Detours

  • Work on Sask Landing Bridge. Reduced speed required. Work staring July 23, 2018. Loads restricted to 3.3 meters. ALL LOADS MUST BE LEGAL.