Type of event: construction

North Battleford Region:
Hwy 40 - Battleford to Wilbert

  • Under Construction

  • Bridge under repair, Reduced speed required, Surface breaks, Rough, One lane traffic, Watch for equipment and persons working, adjacent to road, Flagpersons in attendance, Be prepared to stop, Restricted lane width
  • expect delays of under 20 minutes.
  • Vehicle width limit in effect: 4.1m
  • Reduced speed limit in effect: 50km/h

  • 2019-04-15 to 2019-11-15
  • Additional Info/ Detours

  • Repairs to bridge over Battle River. Traffic will be reduced to a single lane and controlled with the use of traffic signals at either end of the bridge. Traffic should be prepared to stop for a duration of approx. 5 minutes.