Type of event: construction

Tisdale Region:
Hwy 123 - 24 km north of E.B. Campbell Dam to 42 km south of Cumberland House

  • Under Construction

  • Visibility reduced in dust
  • Reduced speed required, Rough, Loose stones, Be prepared to stop
  • Reduced speed limit in effect: 60km/h

  • 2019-05-27 to 2019-09-13
  • Additional Info/ Detours

  • Construction on road bed. Slow to 60KM/H. Construction signs in place.